Critical Path

The sequence or project[1] network with the longest overall duration determining the shortest time possible to complete the project.

Defined Terms
1. project.

An interrelated set of tasks with a beginning and an end that is bounded by time, resources, costs and desired results.

Scroll to Top
Verified by MonsterInsights